Transforming Dublin Airport

Terminal 2......   Did you know that............

  • 95,000 cubic meters of concrete has been used on the terminal, the pier and adjacent airfield stands
  • 13,700 tonnes of steel was used in the terminal and pier
    ~ 90% recycled

  • There are 400 individual toilets in the terminal and pier (including staff)
  • There are 1500 internal doors
  • There are 20,000 light fittings/bulbs
  • There are 62 lifts
  • There are 34 escalators
  • There are 6 km of baggage belts and chutes
  • There are over 2,000 wayfinding and emergency signs
  • That over 9 million man hours have been worked on the project to date
  • The footprint of T2 is 75,000 sq meters (same as T1) and of Pier E is 25,000 sq meters
There will be approximately 9,000 sq meters of retail/catering space